The first phase of engineering surveys for the construction of cable cars on the Garabashi Glacier (Mount Elbrus) is nearing completion.
Kavkaz.RF has announced the completion of the first phase of engineering surveys for a project to build cable cars for athletes on the Garabashi Glacier. During the field work, specialists analyzed soil composition, the depth of the bedrock, and terrain features, and measured elevation changes.
According to Alexander Salamatov, Chief Engineer at Kavkaz.RF, the surveys were complicated by challenging climatic conditions—the work was concluded with a snow cover reaching 1.5 meters, and the drilling rig had to be transported to the site using a snow groomer (piste basher) and a tow vehicle.
In the next phase, the survey data will be processed to determine the optimal locations for cable car pylons and stations, with a focus on minimizing the environmental impact on the glacier while ensuring convenience for athletes.
The project includes:
the construction of a chairlift from the "Bochki" station (3,667 m) to a new alpine base (3,838 m);
the installation of a T-bar (surface) lift reaching an elevation of 3,947 m.
The goal of the project is to provide facilities for year-round athlete training.
It is noted that the Russian Ski and Snowboard Federation opened the season on October 25; currently, about 200 athletes from Moscow, Saint Petersburg, Kaluga, Voronezh, and Lipetsk are training on the glacier.
Preparations for the tourist season are underway, with plans to launch test runs for skiers and snowboarders.