In Sunzha, the water pipe on Chanieva Street is being replaced.
The modernization of utility networks continues in the city. Work is currently underway on S.Sh. Chanieva Street.
What is being done: 400 meters of old pipes are being replaced with modern and reliable ones.
Timeline: the work is scheduled to be completed within a week.
In total, in 2025, water pipes on 12 streets with a total length of more than 4 km were repaired in Sunzha.