Reconstruction of the Nazran-Sunzha road section is coming to an end.
Within the framework of the national project “Infrastructure for Life” reconstruction of the road section “Nazran-Sunzha” 5.75 km long is coming to an end.
A large amount of work has been carried out: the road has been widened to 7 meters, the base and two layers of asphalt concrete sidewalk have been arranged, culverts have been laid, a sidewalk 2 meters wide has been made. Now signs are being installed, markings are being applied and signal posts are being mounted.
The renewed work will ensure fast passage between settlements and communication with the Chechen Republic.