Work continues on the improvement of Novaya Druzhba Street in Sunzha.
The total length of the section being improved is 720 meters, and the width of the roadway is 6 meters. The project includes the construction of a 1.6-meter-wide sidewalk and a storm sewer system for effective water drainage.
To date, workers have completed the storm drainage system and prepared the roadbed for asphalting.
The improvement project is scheduled for completion at the end of October.