Nazran district
Nazran district

The Nazran District was established in 1924 as part of the Ingush Autonomous Region. Being part of the North Ossetian ASSR in 1944-1957, it had another name - Kosta-Khetagur. And after the collapse of the Chechen-Ingush ASSR in 1991-1992, it became part of Ingushetia. It received municipal status only in 2009. It is now divided into two parts due to the configuration of the territory. The district is located in the central and western parts of the republic and borders from the north with the Malgobek district, from the east - with the Sunzha, from the south and west - with the Republic of North Ossetia - Alania. About 100,000 people live on the territory of the district, including internally displaced persons from the RNO-Alania numbering 1,336 people, as well as internally displaced persons from the Chechen Republic - only 368 people. On the territory of the district flow rivers Sunzha, Surkhohi and Nazranka. Also an important water body of the area is the Alkhanchurt Canal. In Nazran district there are 30 educational institutions, including secondary, general and primary schools, as well as 1 hospital-stationary for 35 beds and 10 outpatient clinics. The region has developed agriculture: there are 8 state unitary enterprises, two agricultural cooperatives and 268 farms. There are 8,190 hectares of arable land on the balance sheet.

In Nazran, approximately 10 km of roads will be renovated in its anniversary year.

In the year of its 245th anniversary, Nazran continues to renew its urban infrastructure.

This includes both major repairs of individual sections and the restoration of pavement on streets in need of renovation.

One of the projects is Yuzhnaya Street in the Nasyr-Kort Administrative District. Here, the roadway is being repaired and the surrounding area is being improved. Specifically, a parking area is being created near the Y. I. Arapiyev Ingush Polytechnic College.

The need for an integrated approach is especially noticeable in areas with high traffic congestion. Yuzhnaya Street is located in an area with residential neighborhoods and social facilities, so the road condition and traffic management directly impact residents' daily commute.

Repairs were also previously completed on Lesnaya, Temirkhanov, and Mutsolgov Streets, covering a total length of approximately 800 meters. The renovation affected sections that provide transport links between residential areas and urban infrastructure.

Routine repairs are also being carried out on other streets. Individual sections of the road network are being upgraded, including in response to resident requests. This approach allows for the most problematic areas to be addressed promptly, without having to wait for a major street-wide renovation.

Road renovations are occurring alongside other changes to the urban environment. In Nazran, outdoor lighting is being modernized, public spaces are being landscaped, and courtyards and areas around socially significant facilities are being improved.

For the city, which turns 245 this year, infrastructure development is becoming part of a larger effort to renew Nazran.

Go to group