Preparation of the foundation for laying asphalt next to the Armkha KK is nearing completion.
Before laying a new asphalt pavement on the road section between apartment buildings 54 and 64 in s. Armhi will be laid a new plastic water pipe (about 200 m). The metal pipe that is currently operating there is in a dilapidated state.