Over 400 meters of drainage canal are being constructed in Sunzha to prevent flooding.
The new system will cover Pushkin Street, Engels Street, and Kalinina Lane. The construction was necessitated by regular flooding: Kalinina Lane is located in a low-lying area where water from neighboring streets drains during precipitation. Residents have also repeatedly complained about flooding in courtyards near Engels Street.
The new canal will run from Kalinina Lane through Pushkin Street and Engels Street, ending at the Sunzha River. Its total length will be approximately 410 meters.
The canal on Kalinina Lane has already been laid and concreted. The contractor is currently excavating Pushkin Street. A trench 30 centimeters wide and 50 centimeters deep is being dug, after which it will be concreted and metal gratings installed.
Sunzha Mayor Aslan Umarov inspected the construction progress. On site, he inspected the sites and discussed the next stages of the work with the contractor.
Once construction is complete, water from the three streets will be diverted through a single system directly into the river, reducing the risk of flooding of the roadway and surrounding areas.