ASM Group is considering the possibility of participating in the project of restoration and adaptation of the cultural heritage object of federal importance "Barnaul silver smelting plant", consisting of 17 buildings built on 7.5 hectares.
The construction of the plant is directly connected with the emergence of the city on the Barnaulka River in 1739. Until the middle of the XIX century, 90% of all Russian silver was smelted at the plant. In 1942, the factory was converted into a match factory, the last decades of buildings and grounds abandoned.