Work is underway to clear the riverbed in the Sunzha River.
In preparation for the flood season, specialists are clearing and widening the Sunzha Riverbed to allow for the safe flow of water.
Mayor Aslan Umarov, along with relevant agencies, inspected the work.
Clearing fallen trees, household debris, and sediment will reduce the risk of flooding during periods of heavy rainfall.
The total length of the section is approximately 1,210 meters. The work is ongoing.