In the village of Jeyrakh, on the road from the mosque to the Olgetti-Armkhi fork, the length of which exceeds four thousand meters, preparations for laying a new asphalt surface have begun.
Before the main stage of works, the laying of water pipe with a diameter of 110 mm, withstanding the pressure up to 16 atmospheres, has started. The process is carried out gradually, stage by stage, to minimize possible inconveniences for residents and tourists.
After the completion of all activities, the quality of transportation will be significantly improved, and the village infrastructure will receive a long-awaited upgrade.